Latest News for: cte

Edit

EnCorps Leads Cross-District CTE Teacher Professional Development in California to Advance Workforce Readiness

The Daily Record - Dunn 25 Apr 2026
Joint effort with MVLA and CUHSD connects CTE teachers to align instruction with real-world careers and industry needs ....
Edit

SSUSD Board approves new CTE pathway

The Daily Independent - Ridgecrest 25 Apr 2026
The Sierra Sands Unified School District Board of Education, at its April 16 meeting, approved a new Career Technical Education Pathway, Personal Services course of study at Burroughs High School ... Michelle Savko. × This page requires Javascript ... .
Edit

John and Ed Grimsley shared love of football, and CTE diagnoses

Canton Repository 23 Apr 2026
Ex-NFL QB Matt Hasselbeck and Chris Nowinski, CEO of the Concussion and CTE Foundation, discuss brain injuries and diagnosing CTE in the living ... Ann McKee had found CTE in Ed Grimsley's brother, John, in 2008 ... CTE progresses through four stages.
Edit

County Schools to have ribbon-cutting ceremonies for CTE additions

The Greeneville Sun 15 Apr 2026
Ribbon-cutting ceremonies have been scheduled for the two new additions for Career & Technical Education (CTE) in Greene County Schools ....
Edit

CTE millage on the May ballot for EUP ISD districts

The Sault News 13 Apr 2026
Eastern Upper Peninsula residents will be able to vote on a Career and Technical Education (CTE) millage on May 5 that, if passed, would renew a 1-mill tax originally approved in 2017 for another decade.
Edit

Research reveals McMichael had CTE

TDN 09 Apr 2026
Hall of Fame defensive tackle Steve McMichael was diagnosed with Stage 3 CTE by researchers studying his brain one year after his death at age 67 ....
Edit

Stone Memorial High School announces CTE students of the month

Crossville Chronicle 09 Apr 2026
Stone Memorial High School recently recognized and rewarded the students chosen by their instructors as CTE Students of the Month ....
Edit

Longview ISD moves forward on high school bond project, will honor late principal in naming CTE facility

Longview News-Journal 09 Apr 2026
A new Multipurpose Indoor Facility, the CTE center and Natatorium are under construction at the high school and are scheduled to be completed in 2027 ... The 95,000 square-foot, $59 million CTE center will be on the south side of the high school campus ... .
×